6McNerney Rebecca A.The changing structure of the electric power industry 2000:An update-distribution[EB/OL].http://www.eia.doe.gov/cneaf/electricity/chg_stru_update/chapter3_2.html.2002-10-18.
7Niioka S,Yokoyama R.Supply reliability cost assessment in a generation market[J].International Journal of Electrical Power and Energy Systems,2004,26(5):317~323.
8宋继成.2002年江苏电力实现高速增长[J].江苏电机工程,2002,(2):4-4.
9Schneider L C,Kinzig A P,Larson E D.et al.Method for spatially explicit calculations of potential biomass yields and assessment of land availability for biomass energy production in Northeastern Brazil[J].Agriculture,Ecosystems and Environment,2001,84(3):207~226.