期刊文献+

水平定向连通井砂堵解堵施工浅谈

Preliminary Discussion on the Work of Removal of Sand Plugging in the Horizontal Directional Communicated Well
下载PDF
导出
摘要 主要阐述了水平定向连通水溶开采盐类矿床井组砂堵解堵施工特点和结论。详细介绍江苏淮安赵集矿区苏盐6-1井的砂堵解堵经过,原因分析和砂堵解堵施工过程,以及解堵施工体会。 This paper mainly expatiates the characteristics and conclusion of removal of sand plugging in the horizontal directional ommunicated well pair in which salt deposit is solution-mined. And it also introduces in detail the course of removal of sand plugging, analysis of causes,working process and experience of removal of sand plugging in Jiangsu Salt Well No.6-1 of Zhaoji Concession in Huai' an, Jiangsu province.
作者 王冰
出处 《中国井矿盐》 CAS 2008年第6期14-17,共4页 China Well and Rock Salt
关键词 岩盐 矿床 水溶开采 定向井连通 井堵 解堵施工 Rock salt deposit solution mining directional communicated well well plugging work of plugging removal
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部