摘要
考察了CAST系统厌氧选择区、主反应区中各时段DO、ORP及各项水质污染指标的变化。试验结果表明,在主反应区ORP主要受DO的影响,厌氧选择区中ORP与COD、TP浓度有较明显的相关关系。最后进行了设置三阶段ORP值控制曝气的试验,确认了用ORP控制CAST工艺的可行性。
DO, ORP and other water quality parameters of different reaction stages in anaerobic selector and main reactor of CAST system have been studied. The results indicated that ORP was mainly affected by DO in main reactor and there were clear correlativity between ORP and COD, between ORP and TP respectively in anaerobic selector. Finally a test of three phases aeration with ORP control was set up and the feasibility of using ORP as control parameter of CAST process was affirmed.
出处
《水处理技术》
CAS
CSCD
北大核心
2008年第11期65-67,71,共4页
Technology of Water Treatment
基金
国家高技术研究发展计划(863)项目“城市污水SBR处理设备成套化研究”子课题(2004AA601020-3-01)