本文以太原某变电站工程为例,介绍用碎石桩与CFG桩联合应用处理地基,达到既消除液化,又提高承载力要求双重目的工程实践。
In this paper,some suhstationin the Taiyuan is taken as an example to introduce a method of combining gravel pile and CFG pile to reinforce foundation,this way,it can elininate liqufaction and inercase bearing capacity