期刊文献+

公路工程建设招投标存在问题及治理 被引量:3

The existing problems and regularization of highway engineering construction inviting and submitting tenders
下载PDF
导出
摘要 分析了公路工程招投标存在问题的主要表现形式,探寻了产生这些问题的原因,提出了解决这些问题的一系列措施,其根本目的是为了预防和遏制公路建设招投标违法乱纪现象的滋生,使招投标更有力地促进公路工程的建设。 The main expressive form of highway engineering construction inviting and submitting tenders existing problerns, the reasons were searched and a series of measures to resolve the problems were proposed. Its ultimate goal was to prevent and inhibit highway construction tenders criminal phenomena and make tenders promote highway engineering construction.
出处 《山西建筑》 2008年第34期264-265,共2页 Shanxi Architecture
关键词 公路工程 招投标 不正当竞争 highway engineering, inviting and submitting tenders, unfair competition
  • 相关文献

参考文献5

二级参考文献2

共引文献11

同被引文献20

  • 1中华人民共和国交通部标准,公路工程国内招投标文件范本[S].
  • 2白永红.建设项目审计中的三种审计.理财,2011,.
  • 3Sichombo, B., Muya, M., Shakantu, W., Kaliba, C. The need for technical auditing in the Zambian construction industry[J]. International Journal of Project Management, 2009, 27 (8): 821-832.
  • 4Sohail, M., and Cavill, S. Accountability to Prevent Corruption in Construction Projects[J]. Journal of Construction Engineering and Management, 2008, 134 (9): 729-738.
  • 5Karim, M. A., Smith, A. J. R., Halgamuge, S. Empirical relationships between some manufacturing practices and performance[J]. International Journal of Production Research, 2008, 46 (13): 3583-3613.
  • 6Zhang, Z. F., Chu, X. N. Risk prioritization in failure mode and effects analysis under uncertainty[J]. Expert Systems with Applications, 2011 ( 38 ): 206-214.
  • 7Puente, J., Pino, R., Priore, P., and Fuente, D. A decision support system fbr applying failure mode and effects analysis[J]. International Journal of Quality & Reliability Management, 2002, 19 (2): 137-150.
  • 8Anand Pillay, Jin Wang. Modified failure mode and effects analysis using approximate reasoning[J]. Reliability Engineering & System Safety, 2003, 79 ( 1 ): 69-85.
  • 9Ayyub, B. M. Risk analysis in engineering and economies[M]. Chapman & HaI1/CRC, New York, 2003.
  • 10Abdelgawad, M., Fayek, A. R. Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP[J]. Journal of Construction Engineering and Management, 2010, 136 (9): 1028-1026.

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部