摘要
介绍了φ1.5m×3.0m球磨机换型为φ2.1m×3.0m球磨机在三山岛金矿的安装及应用情况,为小磨机换大磨机提供了经验,为老选矿厂金精矿再磨设备的改造提供了既经济又易行的成功方法。
φ2.1 m × 3.0m ball mill has been installed and applied in Sanshandao gold mine instead of φ1.5m × 3.0m ball mill. It provides great experience for small mill exchange big mill, and provides both economy and easy successfully method for transformation of gold concentrate regrinding equipment of old concentrator.
出处
《黄金科学技术》
2008年第6期55-57,共3页
Gold Science and Technology
关键词
球磨机
换型及安装
应用情况
三山岛金矿
Ball mill
Transformational and installation
Application
Sanshandao gold mine