摘要
介绍了220kV罗四线#19直线塔倾斜、塔材扭曲变形缺陷情况及处理过程,分析了此次缺陷的原因,从运行维护及管理等方面提出了防范措施。
This paper introduces 220kV Lousi line #19 steel tower inclination, tower component distortion defect and its handling, after that defect's reason analysis, the preventing measure is put forward in operating maintenance and management.
出处
《广东输电与变电技术》
2008年第6期36-37,共2页
Guangdong Power Transmission Technology
关键词
铁塔
构件扭曲
处理
Steel tower Component distortion Handling