新兴铸管厂2^#高炉增载墙式地基托换设计 被引量:1

Underpinning Design of Wall-type Foundation of 2^# Blast Furnace with Increasing Load in Xinxing Casting Pipe Plant
原文传递
导出
摘要 新兴铸管厂2#高炉,初次加载采用微型桩基础增大承台面积,形成了结构复杂的基础型式;再次加载受环境条件限制,经综合分析,采用简支结构的墙式托换技术对地基进行处理。这样不仅满足了高炉改造对地基承载力及其变形的要求,而且基础整体性增强,刚度加大,满足了高炉增载对基础稳定性的要求。高炉大幅度增载后正常运转情况表明,托换设计和施工是成功的,其经验为今后类似工程设计提供了有益的借鉴。 Micro-pile foundation is adopted to enlarge bearing platform area when first increasing load on 2^# blast furnace of Xinxing Casting Pipe Plant, so foundation with complex structure is formed; when applying second increasing load, because of environmental limitation, underpinning technology with simply-supported structure is adopted to foundation treatment. It not only meets the requirements of blast furnace transformation to bearing capacity of foundation and its deformation, but also integrity of foundation is reinforced and rigidity in- creased, and meets blast furnace with increasing load to stability of foundation. Normal operation of blast furnace with increasing load shows underpinning design and construction is successful, it provides beneficial reference for similar engineering design in the future.
出处 《勘察科学技术》 2008年第5期43-45,64,共4页 Site Investigation Science and Technology
关键词 高炉改造 高炉增载 墙式托换 blast furnace transformation blast furnace with increasing load underpinning of wall-type foundation
  • 相关文献

同被引文献3

  • 1郑俊杰.地基处理技术[M]{H}武汉:华中科技大学出版社,2004.
  • 2马博恒;何海峰;闫培龙.阳泉市某建筑地基地下水效应分析[J]{H}工程勘察,2012(01):109-112.
  • 3《工程地质手册》编委会.工程地质手册[M],2006.

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部