1Tjendera Santoso, Shabbir Ahmed, Marc Goetschalckx, et al. A stochastic programming approach for supply chain network design under uncertainty. European J. Operational Research, vol. 167, no. 1, 2005.
2Luitzen de Boer, Eva Labro, Pierangela M. A review of methods supporting supplier selection. European J. Purchasing&Supply Management, vol. 7, no. 2,2001.
3Wang S, Shaligram P, Wang Y L. Supply chain position strategy integration, evaluation, simulation, and optimization. Computer & Industrial Engineering, vol. 46, no. 4,2004.
4Erdem E, Reha U, Paul V P, et al. Outbound supply chain network design with mode selection, lead times and capacitated vehicle distribution centers. European J. Operational Research, vol. 165, no. 1,2005.
5Hartmut S. Supply chain management and advanced planning - basics, overview and challenges. European J. Operational Research, vol. 163 ,no. 1,2005.
9Lee Y H. Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers & Industrial Engineering, vol. 43, No. 1 - 2,2002.
9Xiong Gang,Nyberg Tirno R. Comparison between CIMS and CIPS[A]. Proceedings of 1999 7^th IEEE International Conference on Emerging Technologies and Factory Automation[C], October 18-21, 1999, UPC, Barcelona, Catalonia, Spain.
10Lee H L, Padmanabhan V, Whang S. The bullwhip effect in supply chain[J]. Sloan Management Review, 1997,38(4) :93-102.