期刊文献+

电力市场环境下的发电容量充裕性--(二)几种现有方法的分析 被引量:11

State-of-the-art of Studies on Generation Capacity Adequacy in Electricity Market Environment Part Two Analysis of Several Existing Major Methods
下载PDF
导出
摘要 鉴于单一能量市场模式难以确保发电容量充裕性,国际上已提出多种旨在解决该问题的方法。就设计思路、理论基础、实践经验和方法特点等方面,较系统地总结和分析了已提出的近似传统规划方法、容量费用模式、容量责任和装机容量模式、区域装机容量市场法、期权法、运行备用支付法和用户侧容量定购法等。对这些方法在理论上的优缺点和应用方面的可行性、适用范围、配套措施等阐明了观点,在此基础上对确保中国发电容量充裕性提出了初步建议。 Since it is well acknowledged that the energy-only market could not ensure the generation capacity adequacy, a lot of research work has been done around the world to explore new ways to solve this important and yet difficult problem. A comprehensive analysis and comparison is made to several widely employed or established methods including similar traditional planning, capacity payments, capacity obligations and installed capacity market, locatioflal installed capacity market, options, operating reserve payments, and capacity subscription, mainly from those aspects such as methodological design, theoretical foundation, practical experiences and basic features. Then, theoretical advantages and disadvantages, as well as the practical feasibility, the application scope and supporting measures of these methods are clarified. Finally, based on the above analysis and research, some preliminary suggestions are made for ensuring generation capacity adequacy in China.
出处 《电力系统自动化》 EI CSCD 北大核心 2008年第21期1-7,71,共8页 Automation of Electric Power Systems
基金 国家重点基础研究发展计划(973计划)资助项目(2004CB217905) 国家自然科学基金资助项目(70673023)~~
关键词 发电容量充裕性 近似传统规划方法 容量费用模式 容量责任和装机容量模式 区域装机容量市场法 期权法 运行备用支付法 用户侧容量定购法 generation capacity adequacy similar traditional planning capacity payments capacity obligations and installed capacity market locational installed capacity market options operating reserve payments capacity subscription
  • 相关文献

参考文献29

  • 1PEREZ-ARRIAGA L J. Long-term reliability of generation in competitive wholesale markets: a critical review of issues and alternative options [EB/OL]. [2006-08-11]. http://www. iit. upcomillas. es/docs/01JIPA2001. pdf.
  • 2CRAMTON P, STOFT S. A capacity market that makes sense. The Electricity Journal, 2005, 18(7) : 43-54.
  • 3JAFFE A B, FELDER F A. Should electricity markets have a capacity requirement? If so, how should it be priced? The Electricity Journal, 1996, 9(10): 52-60.
  • 4BESSER J G, FARR J G, TIERNEY S F. The political economy of long-term generation adequacy: why an ICAP mechanism is needed as part of standard market design. The Electricity Journal, 2002, 15(7) : 53-62.
  • 5OREN S S. Generation adequacy via call options obligations: safe passage to the promised land. The Electricity Journal, 2005, 18(9): 28-42.
  • 6BOWRING J E, GRAMLICH R E. The role of capacity obligations in a restructured Pennsylvania-New Jersey-Maryland electricity market. The Electricity Journal, 2000, 13 ( 9 ) : 57-67.
  • 7FARR J G, FRANK A F. Competitive electricity markets and system reliability: the case for New England's proposed locational capacity market. The Electricity Journal,2005, 18(8) : 22-33.
  • 8BIDWELL M, HENNEY A. Will the new electricity trading arrangements ensure generation adequacy? The Electricity Journal, 2004, 17(7): 15-38.
  • 9文福拴,吴复立,倪以信.电力市场环境下的发电容量充裕性问题[J].电力系统自动化,2002,26(19):16-22. 被引量:42
  • 10BIDWELL M. Why reliability options are the answer in New England. The Electricity Journal, 2006, 19(4): 32-41.

二级参考文献41

  • 1赵建国.当前我国煤炭价格走势探析[J].中国煤炭,2005,31(3):12-13. 被引量:8
  • 2刘继春,刘俊勇,李华强.发电容量投资的未定权益分析方法[J].电力系统及其自动化学报,2006,18(2):1-4. 被引量:3
  • 3张文,朱治中,邵留国.出清上网电价机制:两部制电价的替代物[J].中国电业,2006(4):44-45. 被引量:1
  • 4Alvarado F L,Meng J,Mota W S,et al.Dynamic Coupling Between Power Markets and Power Systems.In:Proceedings of IEEE PES 2000 Summer Meeting,Vol 4.Piscataway (NJ):IEEE,2000.2201-2205
  • 5PG&E Corporation.2001 Annual Report.http://www.pge,com
  • 6Sheffrin A.California Power Crisis:Are There Regulatory Safeguards in Place to Insure Competitive Markets? http://www.caiso.com
  • 7Dixit A K,Pindyck R S.朱勇译.不确定条件下的投资[M].北京:中国人民大学出版社,2002.24-50.
  • 8DIXIT A K, PINDYCK R S. Investment Under Uncertainty.Princeton (NJ, USA): Princeton University Press, 1994.
  • 9CIARAN D, DAVID M. Investment, Expectations and Uncertainty. Oxford (UK): Blackwell Publishers, 1992.
  • 10YAMAMOTO Y, TEZUKA T. Optimal Investment in Power Plant Under Price Uncertainty. In: Proceedings of the 41st SICE Annual Conference, Vol 2. Osaka (Japan): 2002. 1302-1305.

共引文献93

同被引文献142

引证文献11

二级引证文献89

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部