摘要
介绍了回转式空气预热器安装过程中,密封调整的步骤、方法及安装调试时应注意的问题,总结了双辽发电厂2号炉空气预热器的调试经验。
The steps and methods of seal adjustment and attentive points in erecting process of rotary air preheater are recommended. The debugging experiences of air preheater of shuangliao P. P. No. 2 boiler are summarized.
关键词
回转式
空气预热器
安装
密封调整
锅炉
Rotary Air Preheater Erection Seal Adjustment Dynamic and Static Debugging