摘要
该文通过对粉砂地层地下连续墙施工过程中产生的一些问题的原因分析,探讨了相应的措施对策,可供下一步地铁建设及杭州地区深基坑设计和施工时参考。
Based on the reason analysis of some problems produced in the construction of diaphragm wall in the silt sand stratum,the article approaches the corresponding countermeasures able to provide the reference for the construction of the metro,and the design and construction of deep foundation pit in Hangzhou region.
出处
《城市道桥与防洪》
2008年第11期72-74,共3页
Urban Roads Bridges & Flood Control
关键词
粉砂土层
地下连续墙
深基坑
施工
对策
silt sand stratum,diaphragm wall,deep foundation pit,countermeasure,countermeasures