摘要
文章介绍了某综合楼筏板基础大体积混凝土浇筑施工,通过温差的计算从而确定混凝土浇筑条件和保温养护措施,加强施工过程控制,对大体积混凝土裂缝和缺陷主要控制措施进行阐述,具有较好的推广价值。
The article introduces mass concrete easting for the rafted foundation of a complex building. The casting condition and heat retaining and curing measures are fixed based on the ealeulation of the temperature difference. The main controlling measures against erack and flaw of mass concrete can be well extended.
出处
《安徽建筑》
2008年第6期147-148,160,共3页
Anhui Architecture
关键词
大体积混凝土浇筑
温差裂缝
mass eoncrete casting
crack caused by temperature difference