期刊文献+

一类适用于多星测控调度问题的模型及求解算法 被引量:5

Modeling and Solution of the Problem of Multi-Satellite TT & C Scheduling
下载PDF
导出
摘要 多星测控调度是一个复杂的NP—hard问题,其模型和算法的研究一直是求解的关键和难点。本文从组合优化角度对问题进行描述,建立了多星测控调度问题的数学模型,并利用启发式调度算法予以求解。最后,将算法应用于一个6站10星的调度问题,进行了数值仿真研究。仿真表明,算法能在较短时间内求得任务支持率高且资源使用相对均衡的解,具有较好的寻优能力。 Multi-satellite TT&C scheduling is an NP-Hard problem and the key to its solution is research on models and algorithms. Analysis is given in this paper from the perspective of combinatorial optimization and a model is established. A heuristic scheduling algorithm is proposed to solve the model. Finally, a 6-station 10-satellite scheduling problem is studied and simulated. Simulation shows that the model is applicable to multi-satellite TT&C scheduling, and the heuristic algorithm proposed in this paper produces high quality solutions with high task accomplishment ratio and balanceable load in a short time.
出处 《飞行器测控学报》 2008年第4期1-4,共4页 Journal of Spacecraft TT&C Technology
关键词 多星测控 调度 模型 启发式算法 Multi-satellite TT&C Scheduling Model Heuristic Algorithm
  • 相关文献

参考文献5

  • 1杨永安,樊恒海,冯祖仁,王波,骆永进.一种基于ES法的卫星测控资源调度仿真及实现[J].系统仿真学报,2005,17(4):982-985. 被引量:13
  • 2Chien S, Rabideau G, Knight R, et al. ASPEN-Automating Space Mission Operations Using Automated Planning and Scheduling[C] . SpaceOps 2000. Toulouse, France. 2000.
  • 3Barbulescu L, Watson J, Whitley L, et al. Scheduling Space Ground Communications for the Air Force Satellite Control Network[J]. Journal of Scheduling, 2004, 7(1):7-34.
  • 4Smith B, Engelhardt B, Knight R, et al. Automated Planning for Spacecraft and Mission Design[C]. Third International Symposium on Intelligent Automation and Control. Hawaii. 2000.
  • 5刘洋,陈英武,谭跃进.一类多卫星动态调度问题的建模与求解方法[J].系统仿真学报,2004,16(12):2696-2699. 被引量:11

二级参考文献8

  • 1Martin Wickler, German Zoeschinger. MISSION PLANNING FOR MOMS-2P [C]. SO96.3.04, Germany:Munich, 1996, 16-20.
  • 2E Bensana, G VerfaillieJ, C Agnese, N Bataille, D Blumstein. EXACT and inexact methods for the daily management of an earth observation satellite [EB/OL]. http://www.op.dlr.de/SpaceOps/spops96/misplan/mp3-12/3-12.htm
  • 3William J Wolfe, Stephen E Soresen. Three Scheduling Algorithms Applied to the Earth Observing Systems Domain [J], Management Science, 2000, 46(1): 148-168.
  • 4J C Pemberton, L G Greenwald. on the need for dynamic scheduling of imaging satellites [C], Pecora 15/Land Satellite Information IV/ISPRS Commission I/FIEOS 2002 Conference Proceedings, Colorado: Denver, Nov 10-15, 2002.
  • 5Ari K Jonsson, Jeremy D Frank. A Framework for Dynamic Constraint Reasoning using Procedural Constraints [EB/OL], http://ic.arc.nasa.gov/publications/pdf/ 1999-0107.pdf
  • 6Frank C Langbein. Constraint Satisfaction Problems [EB/OL]. http://www.stanford.edu/class/cs121/lectures/lecture_7_6.ppt
  • 7Weixiong Zhang, Modelin. Solving a Resource Allocation Problem with SoftConstraint Techniques [R]. Technical Report: WUCS- 2002, 13, 2002.
  • 8Waldemar Kocjan. Dynamic Scheduling: State of the art report [R], SICS Technical Report T2002: 28, 2002.

共引文献21

同被引文献47

引证文献5

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部