期刊文献+

城市景观湖水文地质条件模拟浅析

Primary Analysis on Simulation of Hydro-geological Condition of the Sight Lake in Some City
下载PDF
导出
摘要 现代城市中景观湖建设日益增多,尤其北方各大城市已建或在建橡胶坝工程较多,由此引起的湖区水文地质条件危害问题也日益突出。工程应用中多采用水位外推延伸法来对其危害进行估算。根据蓄水后沿岸水文地质条件,采用数学建模方法进行预测评价,通过对湖区相对隔水层的确定、水文地质条件模型的建立等步骤,最后得出湖区浸没危害的预测评价结果。 The sight lakes have been built up increasingly in the present cities, which result in some damage problem more and more obvious. The water- ievel extrapolated and extended method is usually used in application of engineering. The articles is based on coastwise hydro - geological condition after storing water, taking the mathematics model method forecast and evaluate how to confirm the relative separating layer and set up the model of hydro - geological condition and conclude the result of the sunken damage.
出处 《地下水》 2008年第6期3-5,共3页 Ground water
关键词 水文地质 数学建模 浸没危害 Hydrogeology, the mathematic model and the sunken damage
  • 相关文献

参考文献9

  • 1地矿部.地下水动力学,1982-10.
  • 2中国建筑工业出版社.供水水文地质勘察.北京,1980.
  • 3GB50287-99.专门水文地质学.北京,1999.
  • 4中国建筑工业出版社,水力学计算手册.北京,1995.
  • 5GB50287-99.水利水电工程地质勘察规范.[S].国家质量技术监督局和中华人民共和国建设部,1999:9..
  • 6周树明,等.咸阳湖工程地质勘察报告.2002-04.
  • 7高全新.延安湖工程地质勘察报告.2003-09.
  • 8徐铁铮.敦煌党河城区段治理工程地质勘察报告.2005
  • 9韩南石.宝鸡千河橡胶坝工程地质勘察报告.2008-03.

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部