谏壁电厂在10号机组大修期间,采用I/A集散控制系统完成了DCS改造,达到了以CRT为中心的监视操作,实现了直流炉双炉膛的协调控制系统,使控制系统水平有了进一步的提高。
During the overhaul period of Jian Bi Power Plant′s generating unit No.10,the renovation of its DCS was accomlpished by means of a I/A centralized/dispersed control systems,resulting in monitored operation with CRT at its core,realizing a coordinated control of the double furnace once through boiler,and herewith raising the technical level of the control system.