期刊文献+

无余量精密铸造大型涡轮叶片模具设计 被引量:3

Design of Investment Casting Mould for Large Turbine Blade
下载PDF
导出
摘要 某重型燃气轮机第四级透平动叶片(四涡叶片)结构复杂、尺寸大、精度要求高,给模具的设计和加工带来困难。介绍了四涡叶片无余量精铸件模具的设计及加工工艺。通过模具叶身部分的分段来保证环长尺寸并采用工艺孔配合模具加工与组装定位;同时采用斜块自锁夹紧机构保证模具工作时的稳定性。 It is difficult to design and machine the investment casting mould for the forth-level large turbine blade of a heavy gas-turbine due to its complicated structure and large dimension as well as high accuracy requirement.Design and machining of the mould were described,in which the loop dimension is ensured by adopting segmentation treatment for blade body,and fabrication hole is used to localize the mould machining during installation manufacturing,and self-locking clamping unites are adopted to ensure the stability of working time of the mould.
出处 《特种铸造及有色合金》 CAS CSCD 北大核心 2008年第11期864-865,共2页 Special Casting & Nonferrous Alloys
基金 国家高技术研究发展计划(863计划)资助项目(2007AA03Z552)
关键词 大型叶片 无余量精密铸造 分型设计 孔精确定位 自锁夹紧机构 Large Blade,Investment Casting,Design of Mould Parting,Fabrication Hole,Self-locking Clamping Mechanism
  • 相关文献

参考文献12

二级参考文献36

  • 1雷振威.整体导向器精铸工艺[J].航空制造工程,1995(7):13-14. 被引量:1
  • 2卡布洛夫E.H.,格拉西莫夫B.B.,杜布罗夫斯基B.A.,瓦希克E.M..定向结晶时高温合金组织控制的工艺前景[J].材料工程,1996,24(5):16-20. 被引量:3
  • 3丁鹏.正极片落料模设计[J].模具制造,2006,6(3):30-31. 被引量:1
  • 4[1] Design perfermance specifications[M]. Gas Turbine World, 1999-2000 Handbook,1999,20:46-87.
  • 5[2] Farmer R, Fulton K. Design 60% net efficiency in Frame 7/9H steam-cooled CCGT[J]. Gas Turbine World, 1995,25(3):12-20.[3] Stambler I. Hardware being readied for prototype testing in advanced turbine systems[J]. Gas Turbine World, 1998,28(1):36-41.
  • 6[4] Movchan B A. EB-PVD technology in the gas turbine industry: present and future[J]. JOM, 1996.11:40-44.
  • 7[5] Farmer R. Reheat GTs boost 250 and 365-MW combined cycle efficiency to 58%[J]. Gas Turbine World, 1993,23(5):18-23.
  • 8[6] Stambler I. Commercial catalytic Combustion system on-line at California utility[J]. Gas Turbine World, 1998,28(6):22-24.
  • 9[8] McNeely M. Intercooling for LM6000 gas turbines[J]. Diesel & Gas Turbine Worldwide, 1998,30(6):42-45.
  • 10[9] Fulton K. Marine WR-21 succeeds in 500-hour ICR production engine test program[J]. Gas Turbine World, 1997,27(6):22-26.

共引文献51

同被引文献16

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部