破碎大巷变形机理与注锚加固技术 被引量:33

Deformation mechanism of greatly cracked tunnel and support technique by grouting and bolting
下载PDF
导出
摘要 由于受深部复杂高应力作用,姚桥煤矿中央采区大巷多次严重破坏,针对此情况,在地应力实测基础上,分析地应力与巷道稳定性的关系及破坏原因,提出了注锚加固和锚喷注支护结构,根据实测应力状态与数值模拟计算结果,科学、合理、经济地确定了支护参数.工程实践表明:基于地应力实测,采用注锚加固为核心的联合支护结构,有效地解决了深部高应力下破碎岩巷的支护问题. The main tunnels of central mining area were seriously destroyed several times due to complicated high stress and deepness in Yaoqiao Coal Mine. Aimed at this problem, the relationship between ground stress and tunnel stability, damage reasons were analyzed based on results of ground stress obtained in situ. The grouting and bolting reinforce technology and the support structure of grouting and bolting with concrete layer were put forward to solve this problem. The concerned support parameters were scientifically, reasonably and economically defined based on ground stress data obtained in situ and numerical simulation results. The result from project indicates that the support problem of the greatly cracked tunnel in high stress area can be effectively solved by such combined support technology centered by grouting and bolting.
出处 《煤炭学报》 EI CAS CSCD 北大核心 2008年第11期1224-1229,共6页 Journal of China Coal Society
基金 国家自然科学基金资助项目(50774082)
关键词 破碎巷道 注锚加固 地应力 cracked tunnel grouting and bolt reinforcement ground stress
  • 相关文献

参考文献5

二级参考文献83

共引文献2656

同被引文献235

引证文献33

二级引证文献608

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部