摘要 政府投资项目后评价的三个基本功能是监督功能、评价成果的直接利用、概念性影响。政府投资项目后评价在政府投资项目的事前、事中、事后都具有监督约束机制。强化这些监督约束机制的主要措施有构建以审计机关为政府评价主体的后评价体系;建立奖惩机制,完善配套制度等。 The three basic functions of post-evaluation on government investment projects are supervision, direct use of evaluation result and its conceptual influence. The post-project evaluation of government investment projects has supervisory and binding system ante factum, intra factum and post-factum for the projects. The measures to strengthen the above system is to establish an independent government evaluation entity, construct an post-evaluation system on the part of the audit institution as government evaluation entity, set up an award and punishment system and some auxiliary system .
作者 李善波 时现
出处 《审计与经济研究》 CSSCI 北大核心 2008年第6期21-25,共5页 Journal of Audit & Economics
关键词 政府投资项目 项目后评价 监督约束机制 政府评价主体 奖惩机制 government investment projects post-project evaluation supervision and restraint system government evaluation entity award and punishment system
  • 相关文献

参考文献7

二级参考文献30

共引文献29

同被引文献67

引证文献10

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部