期刊文献+

基于GM(1,1)的装备维修备件需求量预测研究 被引量:2

Forecast of equipment maintenance spare-parts requirement based on GM(1,1)
下载PDF
导出
摘要 基于灰色模型GM(1,1)的基本原理,建立了装备维修备件需求量预测分析方法;经示例应用分析表明,该方法为精确预测装备维修备件需求量提供了一种有效手段。 Based on Grey Model (GM) (1,1), a forecast method of equipment maintenance spareparts requirement was established and applied to analyze some equipment in using. It indicates that the method based on GM (1,1) was scientific and effective.
出处 《实验技术与管理》 CAS 2008年第11期178-180,共3页 Experimental Technology and Management
关键词 装备 维修备件 需求量 GM(1 1) equipment maintenance spare-parts requirement GM (1, 1)
  • 相关文献

参考文献5

二级参考文献7

  • 1周青龙.可靠性工程[R].石家庄: 军械工程学院,1993-3..
  • 2甘茂治 康建设 等.军事装备维修工程学[M].北京:国防工业出版社,1999..
  • 3W.David Kelton, Randall P.Sadowski, Deborah A. Sadowski. SIMULATTON WITH ARENA SECOND EDITION[M]. Singapore,The McGraw-Hill Companies, Inc, 2002.
  • 4Sherbroode,.METRIC C.C. Multi-Echelon Technique for Recoverasle Item control[J]. Opens, Res, 1968, 16, 122-144.
  • 5Muckstradt. Are Multi-Echelon Inventory Methods with Implementing in systems with low-Demand-Rate Item?[J]. Mgmt, Sci, 1980, 26, 483-494.
  • 6杨宇航,冯允成,庾红,李会杰.基于仿真的复杂武器系统任务可靠性计算方法研究[J].系统仿真学报,2002,14(2):169-172. 被引量:10
  • 7杨宇航,冯允成.复杂可修系统可靠性维修性综合仿真研究[J].系统仿真学报,2002,14(8):978-982. 被引量:28

共引文献112

同被引文献20

  • 1杨宏伟.大学物理实验中的灰色建模与仿真[J].实验技术与管理,2005,22(10):104-106. 被引量:8
  • 2姜启源.2000网易杯全国大学生数学建模竞赛.数学的实践与认识,2001,31(1):2-4.
  • 3CROSTON J. Forecasting and Stock Control for IntermittentDemands [ J ]. Operational Research Quarterly, 1997, 23 ( 3 ) :289 - 303.
  • 4SYNETO A A, BOYLAN J E. On the Bias of Intermittent Demand Estimate [ J ]. International Journal of Production E- conomics ,2001,71 ( 1/2/3 ) :457 - 466.
  • 5LEVEN E,SEGERSTEDT A. Inventory Control with a Mod- ified Croston Procedure and Erlangdistribution [ J ]. Interna- tional Journal of Production Econormics, 2004,90 ( 3 ) : 361 - 367.
  • 6ROMEIJNDERS W,TEUNTER R, VAN JAA RSVELDW. A Two- step Method for Forecasting Spare Parts Demand U- sing Information on Component Repairs[ J ]. European Jour- nal of Operational Research,2012,220(2) :386-393.
  • 7GRANGE F. Challenges in Modeling Demand for InventoryOptimization of Slow Moving Items [ C ]// Simulation Con- ference Proceedings. Washington, DC: IEEE, 1998:1211 - 1217.
  • 8KAMATH K R,PAKKALA T P M. A Bayesian Approach to a Dynamic Inventory Model Under Unknown Demand Dis- tn'buting[ J ]. Computers and operations research, 2002,29 (4) :403 -422.
  • 9刘鹏超,张喜刚,王荣桥.基于灰色系统理论的高校实验室固定资产投资项目竣工验收风险评价[J].实验技术与管理,2011,28(4):200-202. 被引量:4
  • 10张光轶,苏艳琴,马颖亮,许爱强.一种融合粗糙集与灰模的装备故障预测方法[J].计算机测量与控制,2012,20(2):291-293. 被引量:3

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部