论现代工程建设中的投资控制

Investment Control of Modern Engineering Construction
下载PDF
导出
摘要 现代工程项目管理应该加强投资控制,尤其是在项目的可行性研究阶段和设计阶段更应该引起重视.作为投资管理人员,在加强自身素质、工作能力的同时,还应该采取必要的、可行的方法和手段,制定出合理的工程投资计划,并在实施过程中,加强投资控制,采取有效的手段和制约机制,确保投资计划按部就班的纳入到工程当中去,以避免给建设单位在资金筹措过程中带来不必要的麻烦和风险. For the modern engineering project management, the investment control should be strengthen , in particular in the project feasibility study stage and the design stage, it should be brought to the attention. The investment administrative personnel should not only strengthen own quality, working ability , but also adopt the essential, feasible method, formulates the reasonable proiect investment plan. In the implementation process, the investment control should be enhanced, the effective method and the restriction mechanism should be adopted to guarantee the investment plan integrated to the proiect along a prescribed path, in order not to bring unnecessary trouble and risk to the construction unit in the process of fund raising.
作者 王志强
出处 《吉林建筑工程学院学报》 CAS 2008年第4期78-81,共4页 Journal of Jilin Architectural and Civil Engineering
关键词 投资控制 可行性研究 约束机制 “三超”现象 合同管理 投资计划 经济论证 招投标管理 审批制度 investment control feasibility study restraint mechanism "three ultra" phenomenon contract manage-ment investment plan economy proof bid management examination and approval system
  • 相关文献

参考文献2

  • 1[1]王雪青.全国监理工程师培训教材--工程建设投资控制[M].北京:中国建筑工业出版社,2004.
  • 2[2]谭德精.全国造价工程师培训教材--工程造价确定与控制[M].北京:中国计划出版社,2004.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部