摘要
介绍了国产化首台690t/h循环流化床锅炉特点,阐述了锅炉调试内容与试运行过程,通过对神华亿利自备电厂200MW机组690t/h循环流化床锅炉调试,总结锅炉调试和试运行过程中出现的问题以及解决方法。
The configuration features of the first indigenous 690t/h circulating fluidized bed boiler are introduced, and the commissioning contents and try-operation process of boiler is described. With the commissioning for 690t/h circulating fluidized bed boiler, the problems and resolve method are summarized in the commissioning and try-operation of the 200MW unit in Shenghua-yili Captive Power Plant.
出处
《电站系统工程》
北大核心
2008年第6期35-38,共4页
Power System Engineering
关键词
循环流化床锅炉
调试
运行
circulating fluidized bed boiler (CFB)
commissioning
operation