期刊文献+

小企业集群虚拟企业的多项目优化赶工方法研究 被引量:1

The study of optimized rushing of enterprise multi-projects in virtual enterprise of small enterprise cluster
下载PDF
导出
摘要 小企业集群虚拟企业中的企业,由于参与了多个虚拟企业的运作,其订单信息处于动态变化之中,如何保证各订单按期交货是当下急需解决的问题。文章基于动态变化的企业订单信息,研究了生产计划调整问题,提出了两个阶段的调整方法,一是对企业当前的多个生产项目按照优先级评价结果进行排序,二是对各项目进行优化赶工,使企业能在订单信息动态变化的状态下,各项目满足交货期和订单质量要求并额外费用最低。 How to guarantee prompt delivery of goods in schedule is an urgent issue for the enterprises in virtual enterprise of small enterprise cluster at present, because the small enterprise usually participates in a number of virtual enterprises, and the order information is changing dynamically. Based on order information of dynamic change, the problem of production plan adjustment is researched and a two-stage adjustment method is proposed in this paper. First, multi-projects are ranked according to the priority level of evaluation result, second, rushing of each project is optimized, and each project additional cost is minimized with the premise of guaranteeing delivery date and quality.
机构地区 宁波大学工学院
出处 《制造业自动化》 北大核心 2008年第11期26-30,共5页 Manufacturing Automation
基金 国家自然科学基金资助项目(70540023) 浙江省自然科学基金(Z604342)
关键词 小企业集群虚拟企业 优先级 计划调整 优化赶工 virtual enterprise of small enterprise cluster priority level plan adjust optimized rushing
  • 相关文献

参考文献4

二级参考文献40

  • 1徐震浩,顾幸生.不确定条件下具有零等待的流水车间免疫调度算法[J].计算机集成制造系统,2004,10(10):1247-1251. 被引量:21
  • 2余建军,孙树栋,郑锋.基于动态评价免疫算法的车间作业调度研究[J].机械工程学报,2005,41(3):25-31. 被引量:18
  • 3[1]EVARISTO R, FENEMA P C V.A typology of project management emergence and evolution of new forms [J].International Journal of Project Management,1999, (17):275-281.
  • 4[2]SAUER J, SUELMANN G, APELRATH H J. Multi-site scheduling with fuzzy concepts [J].International Journal of Approximate Reasoning,1998, (19) :145-160.
  • 5Jian A K,Int J Prod Res,1997年,35卷,1期,281页
  • 6Lee C Y,Int J Prod Res,1997年,35卷,4期,1171页
  • 7Liu H J,J Intell Manuf,1996年,7卷,2期,243页
  • 8Sim S K,Int J Prod Res,1994年,32卷,8期,1759页
  • 9Chu H,Int J Prod Res,1993年,31卷,4期,771页
  • 10BRUCK P,DREXL A,MOHRING R,NEUMANN K,PESCH E. Resource- constrained project scheduling: notation, ckassification, models, and methods[J]. European Journal of Operational Research,1999,112(1) :3-41.

共引文献110

同被引文献1

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部