摘要
从路基沉降、施工方法和结构体系上对桥头跳车病害进行原因分析,在此基础上提出了减少病害的防治措施,从而有效地避免桥头跳车病害的产生,以改善行车条件,促进经济发展。
From the roadbed settlement, construction methods and structural system, the paper analyzes the reason for the vehicle jump over the bridge head. On the base of this, the paper points out the prevention measure to reduce the problem in order to avoid the vehicle jump effectively and to improve the vehicle operation and to enhance the economic development.
出处
《山西建筑》
2008年第35期305-306,共2页
Shanxi Architecture
关键词
桥头跳车
台后填土
防治措施
vehicle jump over bridge head, filling soil on the backside of the bridge, prevention measure