摘要
总结了新钢已建三个循环水泵站的建设经验,对新建的6#高炉循环水泵站的设计方面作了较全面的优化。
The construction experience of newly built three circulating water pump stations of Xinyu Iron and Steel Co., Ltd was summarized. The design scheme of the circulating pump station for No.6 blast furnace was optimized all-sidedly.
出处
《冶金动力》
2008年第6期56-57,59,共3页
Metallurgical Power
关键词
高炉循环水泵站
设计
运行方式
优化
circulating water pump station for blast furnace
design
running mode
optimization