期刊文献+

吉林省星星哨水库提高汛限水位运行的可行性论证 被引量:2

Feasibility Study on Raising the Xingxingshao Reservoir's Water Level Limit in Flood Season in Jilin Province
下载PDF
导出
摘要 为应对当前水资源供需矛盾问题,高效的运用水库水资源,实现多蓄水多发电的目的尤显重要。水库的汛限水位直接关系到水库发电效益与水库防洪安全两个方面。汛限水位越低,预留的水库调洪库容越大,对水库防洪较为有利,但是从其发电效益角度讲就会造成浪费。从星星哨水库存在问题、现状供水与灌区需水情况入手,在前人的研究基础上[1],从其他角度来补充论证,提出了抬高汛限水位、增加水库供水能力的必要性,并分析讨论了抬高汛限水位对水库防洪标准及枢纽建筑物的影响,论证了提高星星哨水库汛限水位的可行性。 To the current conflict between supply and demand of water resources, efficient use water of reservoirs is more important, Flood control water level of reservoir is directly related to power generation efficiency and safety of the flood control. The lower flood control level the greater reservoir flood storage capacity. But its power generation efficiency will lead to resources waste. This thesis discussed the influence of increasing the flood limit level on flood control standard of reservoir and project structures and proved the feasibility of increasing the Xingxingshao reservoir supply capacity.
出处 《南水北调与水利科技》 CAS CSCD 2008年第6期130-132,共3页 South-to-North Water Transfers and Water Science & Technology
基金 吉林省科技厅科技发展基金(20010432)
关键词 星星哨水库 汛限水位 防洪安全分析 Xingxingshao Reservoir limited water level flood safety analysis
  • 相关文献

参考文献3

二级参考文献4

共引文献24

同被引文献10

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部