期刊文献+

模糊神经网络与启发式算法相结合的制造单元构建方法 被引量:13

Manufacturing cell formation approach combing fuzzy neural network with heuristic algorithm
下载PDF
导出
摘要 为提高制造单元构建效率和制造单元的可实施性,提出了模糊自适应谐振神经网络与启发式算法相结合的制造单元构建方法。该方法以加工相似模式匹配思想为指导,将制造单元的构建分为两个阶段。首先对标准模糊自适应谐振神经网络进行改进处理,并以此构建初始的工件族和设备集合;然后,在初始工件族和设备集合的基础上,建立基于规则的启发式资源优化分配算法,解决制造单元的设备共享、可选设备分配和设备负荷不均等问题。最后,以某企业机加车间生产的典型工件为例,验证了算法的有效性。 To improve the efficiency of manufacturing cell formation and its practicability, a manufacturing cell formation ap proach combing Fuzzy Adaptive Resonance Theory Neural Network (FARTNN) and heuristic algorithm was proposed. Guided by ideas of matching of similar machining modes, this approach was divided into two stages. Firstly, the improved FARTNN was used to form the basic part family and equipment sets. Then, based on the basic part family and equipment sets, a rule-based heuristic algorithm for resource allocation was presented to resolve the problems of equipment sharing, alternative equipment allocation and unbalanced equipment load in the manufacturing cell, etc. Finally, the validity of the approach was proved by its application in a workshop of a manufacturing enterprise.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2008年第11期2175-2183,共9页 Computer Integrated Manufacturing Systems
基金 国防基础科研资助项目(B0920060901)~~
关键词 模糊神经网络 启发式算法 可重构制造系统 制造单元 fuzzy neural network heuristic algorithm reconfigurable manufacturing system manufacturing cell
  • 相关文献

参考文献8

二级参考文献15

  • 1D.K. McCool(Agricultural Engineer, USDA-ARS, Washington State University, Pullman, WA)C.D. Pannkuk(Soil Scientist, USDA Forest Service, Rocky Mountain Research Station, Moscow, ID)K.E. Saxton(Hydrologist, USDA-ARS, Washington State University, Pullman, WA.WINTER RUNOFF AND EROSION ON NORTHWESTERN USA CROPLAND[J].International Journal of Sediment Research,2000,15(2):149-161. 被引量:5
  • 2咸仁英 梁遗金(译).成组技术在生产管理中的应用[M].北京:经济科学出版社,1988..
  • 3胡运权,运筹学教程,1998年
  • 4咸仁英,成组技术在生产管理中的应用,1988年
  • 5Giaro. NP-hardness of compact scheduling in simplified open and flow shops. European Journal of Operational Research, 2001, 30: 90~98
  • 6Kaschel J, Tobias T, Bernd Z. Real-time dynamic shop floor scheduling using evolutionary algorithms. Int. J. Production Economics, 2002, 79:113~ 120
  • 7Masahiro A, Masahiko F, Ichiro I. Anoptimization-oriented method for simulation-based job shop scheduling incorporating capacity adjustment function. Int. J. Production Economics, 2003, 85:359~369
  • 8Dirk C M, Christian B. Discrete optimization an efficient genetic algorithm for job shop scheduling with tardiness objectives. European Journal of Operational Research, 2004,155:616~630
  • 9Liaw C F. An efficient tabu serarch approach for the two-machine preemptive open shop scheduling problem.Computers & Operations Research, 2003, 30:2 081~2 095
  • 10Michel G, Nathalie G, Sylvie N. A contribution to the stochastic flow shop scheduling problem. European Journal of Operational Research, 2003, 151: 415~433

共引文献36

同被引文献146

引证文献13

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部