首台500kV线路串联电抗器在华东电网的应用研究 被引量:15

Application of the first 500kV series reactors to East China Power Grid
原文传递
导出
摘要 为解决目前华东500 kV电网面临的短路电流超标的严重问题,2008年华东电网有限公司在泗泾变电站成功实施了500 kV线路串联电抗器成套装置示范工程。介绍了500 kV串联电抗器在华东电网应用中的安装位置选点、线路断路器瞬态恢复过电压防治等关键技术研究,通过实测数据与理论,分析评价了工程投运的系统适应性与电磁环境影响。 To solve the serious short-circuit current problem facing 500 kV grids of East China, East China Grid carfled out the demonstration project of installing the 500 kV series reactor in Shengsi Substation in 2008. The key technologies of the project are studied, including site selection of the reactor and prevention of instant recovery over-volt- age of the circuit breaker. Based on actual data and relevant theory, the adaptability of the system and the electromagnetic influence are analyzed.
出处 《华东电力》 北大核心 2008年第11期47-50,共4页 East China Electric Power
关键词 串联电抗器 选点 瞬态恢复过电压 系统适应性 电磁环境 series reactor site selection instant recovery over-voltage system adaptability electromagnetic environment
  • 相关文献

参考文献3

二级参考文献11

  • 1殷可,高凯.应用串联电抗器限制500kV短路电流分析[J].华东电力,2004,32(9):7-10. 被引量:38
  • 2祝瑞金 杨增辉.华东500 kV电网短路电流抑制措施的研究[Z].,..
  • 3DRY TYPE AIR CORE REACTORS:Evolution of Technology. Trench Group.
  • 4Con Edison System Fault Current Management Plan, Presentation at the NYISO joint TPAS/IITF meeting, Octorber 4,2001.
  • 5Australasia news: ABB installs its largest series reactor at TransGrid's Sydney South 330 kV Substation.
  • 6SCCL-Short-Circuit Current Limitation with FACTS in High-Voltage Systems: Application & Features_V2 PTD HI6-H 1 PD/Re.
  • 7Accepted Bulk Power Series Reactor Applications on the PJM System.
  • 8Australasia news: ABB installs its largest series reactor at TransGrid's Sydney South 330 kV Substation
  • 9SCCL-Short-Circuit Current Limitation with FACTS in High Voltage Systems: Application & Features_V2 PTD H 16-H 1PD/Re
  • 10Accepted Bulk Power Series Reactor Applications on the PJM System.

共引文献59

同被引文献115

引证文献15

二级引证文献82

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部