摘要
为解决目前华东500 kV电网面临的短路电流超标的严重问题,2008年华东电网有限公司在泗泾变电站成功实施了500 kV线路串联电抗器成套装置示范工程。介绍了500 kV串联电抗器在华东电网应用中的安装位置选点、线路断路器瞬态恢复过电压防治等关键技术研究,通过实测数据与理论,分析评价了工程投运的系统适应性与电磁环境影响。
To solve the serious short-circuit current problem facing 500 kV grids of East China, East China Grid carfled out the demonstration project of installing the 500 kV series reactor in Shengsi Substation in 2008. The key technologies of the project are studied, including site selection of the reactor and prevention of instant recovery over-volt- age of the circuit breaker. Based on actual data and relevant theory, the adaptability of the system and the electromagnetic influence are analyzed.
出处
《华东电力》
北大核心
2008年第11期47-50,共4页
East China Electric Power
关键词
串联电抗器
选点
瞬态恢复过电压
系统适应性
电磁环境
series reactor
site selection
instant recovery over-voltage
system adaptability
electromagnetic environment