期刊文献+

蚁群优化算法在电镀试验台作业调度的应用 被引量:2

The Application of Ant Colony Optimization Algorithm to Job Scheduling Probrem in Electroplate Test Platform
下载PDF
导出
摘要 针对电镀试验台作业调度问题的特点,提出了一种混合优化的蚁群算法,即在蚂蚁寻优中,引入杂交和变异机制,有效地解决了电镀试验台作业调度问题.实验结果表明,与一般的蚁群算法相比,该算法性能更优. Airnming at the characteristics of job scheduling probrem in electroplate test platform, this paper a hybrid optimization algorithm is proposed, that is bring in crossover and mutation operation. Using this algorithm, job scheduling probrem in electroplate test is effectively solved. The experiment results show that the proposed method has better performance, compareing with the ant colony algorithm.
作者 徐克奇
出处 《微电子学与计算机》 CSCD 北大核心 2008年第12期210-212,共3页 Microelectronics & Computer
基金 上海市教育委员会科研项目(060Z023)
关键词 蚁群算法 电镀 作业调度 ant colony algorithm electroplate job scheduling
  • 相关文献

参考文献6

二级参考文献35

  • 1[1]李文沅(Li Wenyuan).电力系统安全经济运行-模型与方法(Secure and economic operation of electrical power system - Model and method)[M].重庆大学出版社(The University of Chongqing Press),1989,3.
  • 2[3]Ruzic S,Rajakovic N,A new approach for solving extended unit commitproblem[J].IEEE Transactions on Power System,1991,6(1).
  • 3[5]Cheng C P,Liu C W,Liu C C.Unit commitment by lagrangian relaxation and genetic algorithm[J].IEEE Transactions on Power System,1995,15(2).
  • 4[7]Ouyang Z,Shahidehpour S M.A multi-stage intellegent system for unit commitment[J].IEEE Transactions on Power Systems,1992,7(2).
  • 5[8]Zhuang F,Galiana F D.Unit commitment by simulated annea-ling[J].IEEE Transactions on Power Systems,1990,5(1).
  • 6[9]Dorigo M,Maniezzo V,Colorni A.Ant system optimization by a colony of cooperating agents[J].IEEE Transactions on System, Man and Cybernetics-Part B:Cybernetics,1996,26(1):29-41.
  • 7[10]Yu I K,Chou C S,Song Y H.Application of the ant colony search algorithm to short-term generation scheduling problem of thermal units[C].Power System Technology Proceedings.1998,552-557.
  • 8[11]Wang S J,Shabidehpour S M,Kirchen D S.Short-term generation scheduling with transmission and environmental constrains using an augmented lagrangian relaxation[J],IEEE Transactions on Power System,1995,10(3).
  • 9[12]Wood A J,Wollenberg B F.Power system operation and control[M].Power Technologies,Inc.Schenectady,New York 1984.
  • 10[13]Ayoub A K,Patton A D.Optimal thermal generating unit commit-ment[J],IEEE Transactions on Power Apparatus and System,1970,PAS-89(2).

共引文献49

同被引文献12

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部