220 kV变电站的110 kV母线分裂运行

110 kV Bus Splitting Operation in 220 kV Substation
下载PDF
导出
摘要 唐山市用电量和用电负荷持续快速增长,为保证电网及主设备安全,唐山供电公司积极调整电网运行方式,采取了将220 kV变电站的110 kV母线分裂运行和事故情况下变电站值班员无需等待调度令自行处理的原则,既保证用户的用电需求,又有效地防止了枢纽变电站全停和大型变压器损坏事故的发生。 The power consumption and power load in Tangshan city is increasing rapidly. In order to ensure the safety of the power grid and equipment ,Tangshan Power Supply Co. tried to adjust the operation mode of the power grid,such as 110 kV bus splitting operation of 220 kV substation was adopted, and operators in the substation were able to clear the trouble without waiting for the command from dispatching center in case of emergency. This not only ensures the power supply for the consumers but also effectively prevent blackout of key substations and large transformers failure.
机构地区 唐山供电公司
出处 《华北电力技术》 CAS 2008年第12期13-15,共3页 North China Electric Power
关键词 变电站 母线分裂运行 电网安全 substation bus splitting operation power grid safety
  • 相关文献

参考文献2

  • 1Q/GDW156—2006,城市规划电力网设计导则.
  • 2电力工程师手册.北京:中国电力出版社,2003,3.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部