500kV输电线路铁塔严重倾斜的快速修复 被引量:9

Quick Restoration of a Seriously Inclined Pylon in 500 kV Transmission Line
下载PDF
导出
摘要 500kV贺罗Ⅱ线476号铁塔发生基础下陷,造成杆塔严重倾斜,主材严重弯曲,其中部分斜材被拉裂。经过技术经济分析,选择了一个"校正杆塔、及时恢复送电"的方案,采取"杆塔利用四根抱杆加固、塔腿垫高、更换变形塔材、增加4根临时拉线保护"等措施3天内将铁塔修复。 The No. 476 pylon of the 500 kV Hezhou-Luodong line Ⅱ suffered a serious inclination due to the sedimentation of pylon base. The primary shank was serious bended and some minor slanted struts were ripped apart. Considering the technical and economical aspects, a solution of "rectifying pylon and restoring power transmission ASAP" is chosen, and with measures of "solidified the pylon, underlaid the legs of pylon, replaced the distorted parts and set 4 additional temporary stay wire" the pylon is restored within 3 days.
出处 《南方电网技术》 2008年第5期84-85,共2页 Southern Power System Technology
关键词 输电线路 杆塔倾斜 纠偏 transmission line tower inclination rectify inclination
  • 相关文献

同被引文献49

引证文献9

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部