摘要
介绍番禺/惠州油气田项目PY30-1导管架上封隔器的车间组装、测试,现场安装及调试过程。为今后其他大型深水导管架项目的封隔器组装安装及调试提供参考。
This paper introduces the jacket's packer workshop assembly, test, installation and debugging of PAN YU/HUI ZHOU oil and gas project PY30-1. The project is the first time to buy some scattered accessory assembly work, test and installation debugging in the domestics building workshop. So it is necessary to introduce the whole process of installation, test, which provide references for others deep water jacket projects which need packer installation and test in details.