介绍了湖北省首台600MW带炉水循环泵的超临界复合循环锅炉的调试情况,对调试中出现的主要问题进行了分析,为该类型锅炉的调试应用提供参考。
This Paper introduces the commissioning of the first 600MW supercritical combined-circulation boiler with boiler water circulating pump in Hubei province and analyses the main problems in commissioning. The discussion is a reference for this boiler's commissioning work.