摘要
武汉天兴洲公铁两用长江大桥在国内首次采用了整节段钢桁梁架设工艺,详细介绍了钢桁梁整节段的组拼技术及板桁结合钢桁梁整节段的施工要点。
The construction technology for erection of full blocks of steel truss girder was applied to Wuhan Tianxingzhou Changjiang River Rail cure Road Bridge for the first time in China. In this paper, the assembling techniques for the full blocks and the key construction points of these slab and truss composite blocks of the steel truss girder of the Bridge are described in detail.
出处
《桥梁建设》
EI
CSCD
北大核心
2008年第6期5-7,共3页
Bridge Construction
关键词
铁路与公路两用桥
桁梁
整节段组拼
施工工艺
rail cum-road bridge
truss girder
full block assembling
construction technology