摘要
桥巩水电站工程施工强度高、工期紧、施工难度大、结构复杂,根据工程施工条件和特点,通过对工程施工组织施工方案精心策划,确定合理的施工方案,确保了水电站建设目标的实现。文章侧重从不同的施工阶段其不同的施工方案加以论述。
In view of such engineering conditions and characteristics of Qiaogong hydropower station as high construction strength, tight schedule, great engineering difficulty and complex structure, a rational construction scheme is defined for the project by an elaborate planning on construction organization, which ensures that the construction objective can be achieved. Different construction schemes for different construction stages are studied in the paper.
出处
《红水河》
2008年第6期12-16,共5页
Hongshui River
关键词
施工程序
施工布置
施工方案
桥巩水电站
construction procedure
construction layout
construction scheme
Qiaogong hydropower station