摘要
针对桥巩水电站现场施工条件、工程特点及二期要求,通过对桥巩水电站二期工程施工总体布置科学的规划,充分、合理地利用资源,使二期工程施工进度加快,并取得较好的经济效益。
Based on site engineering conditions, characteristics and construction period of Qiaogong hydropower station, a scientific programming on general engineering layout is made for 2nd stage project of the station, and it accelerates the construction progress and yields favorable economic benefits by making use of resources adequately and rationally.
出处
《红水河》
2008年第6期17-22,33,共7页
Hongshui River
关键词
总体布置
二期工程
桥巩水电站
general layout
2nd stage project
Qiaogong hydropower station