软弱围岩条件公路连拱隧道施工方法数值分析 被引量:4

NUMERICAL SIMULATION ANALYSIS ON THE CONSTRUCTION METHODS OF A MULT-ARCH ROAD TUNNEL IN WEAK SURROUNDING ROCKS
下载PDF
导出
摘要 针对软弱围岩条件(IV级围岩)大跨度连拱隧道施工安全和围岩稳定问题,结合工程实际,采用非线性有限元法,对连拱隧道施工过程进行了数值计算分析,对比了中导洞-核心土和三导洞先墙后拱施工工艺下隧道的位移特征、点安全系数、二次衬砌应力、锚杆和钢拱架轴向应力。实际工程研究表明,中导洞-核心土施工工艺开挖软弱围岩条件大跨度公路连拱隧道是可行的,对类似软弱围岩条件的隧洞施工有一定参考价值。 The Construction safety and rock mass stability of shallow multi-arch tunnel in weak surrounding rocks are very critical in projects. Based on a multi--arch road tunnel, the nonlinear Fern is used to study the displacement, point safety fac- tor, lining stress, stress of bolt and steel arch beam in the process of construction under two typical construction plans, inclu- ding first center leading tunnel and then key rock soil construction plan, first center leading tunnel and then two sidewall leading tunnel construction plan. The computational results indicate that center leading tunnel key rock soil construction plan used in the excavation of multi-arch tunnel in weak surrounding rocks is feasible, which provide a guide for the construction of tunnels in similar weak Surrounding rock.
出处 《地质灾害与环境保护》 2008年第4期92-95,共4页 Journal of Geological Hazards and Environment Preservation
基金 四川大学青年科学基金资助项目(编号:07072)
关键词 连拱隧道 施工方法 软弱围岩 数值仿真 multi-arch tunnel construction plan weak surrounding rock numerical simulation
  • 相关文献

参考文献4

二级参考文献28

共引文献230

同被引文献23

引证文献4

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部