梯级水电站实时补偿增益多因素综合分配方法探讨 被引量:6

Discussion on multifactor distribution method of real-time compensation operation of cascade hydropower stations
下载PDF
导出
摘要 龙头水库带一串日调节或无调节电站组成的水电梯级,在汛初和汛期两场洪水之间的特定时段开展小流量泄流补偿调度,既可以减少龙头水库无益弃水,又能增加下游电站发电量;分析了影响实时补偿调度增益分配的主要因素;提出了补偿调度增益的计算原理和龙头水库泄流补偿调度风险率与期望损失计算方法;提出了具有明确物理意义的补偿调度增益多因素综合分配模型。通过沙溪流域的实例分析,表明提出的方法能够取得合理的结果。 In the cascade hydropower stations composing of the 'leading reservoir' and some daily regulated or unregulated hydropower stations, the ' leading reservoir' discharges less water for compensation operation during the special periods(between dry season and flood season). This method can not only reduce the useless waste water of leading reservoir, but also increase the electric energy of downstream hydropower stations. Some main factors influencing the distribution of extra gain of real-time compensation operation are analyzed. Some calculation principles of compensation operation and calculating methods of risk and expected loss of releasing water from leading reservoir for compensation operation are developed. A physical muhifactor distribution model of compensation operation is suggested. The model is demonstrated for analysis of Shaxi basin and the results show that the method is satisfactory and effective.
出处 《水力发电学报》 EI CSCD 北大核心 2008年第6期22-26,共5页 Journal of Hydroelectric Engineering
关键词 水利经济 增益分配 梯级水电站 实时补偿调度 water economy extra gain distribution cascade hydropower stations real-time compensation operation
  • 相关文献

参考文献3

二级参考文献11

共引文献45

同被引文献62

引证文献6

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部