摘要
梯级水电站通过联合调度,提高了水电整体规模效益和水能利用效率,降低了总运行成本,通过对万家寨与龙口水电站短期联合发电调度的分析,以期在万家寨和龙口水电站的联合调度运行中起到一定的作用。
By combined operation, the step hydroelectric station has improved overall economy of scale and the hydroenergy utilization ratio, reduced operating cost. Through analysis of short period combined generating operation in Wanjiazhai and Longkou hydropower station, we hope this paper has effect on combined generating operation in Wanjiazhai and Longkou hydropower station.
出处
《山西建筑》
2008年第36期357-358,共2页
Shanxi Architecture
关键词
水电站
联合发电调度
调度模型
hydropower station, combined generating operation, scheduling model