通过对某联营企业电解铝项目的设计,指出这一类工厂总平面布置在用地偏紧的情况下.应根据企业的场地现状,抓住重点,以电解厂房和铁路布置为突破口,解决用地不足的问题。防洪设计,既要保重点,又要照顾一般,具体情况具体分析。
According to a design on electrolytic aluminum project, the paper points out that if the layout of plant to be built does not have enough land, it should be considered in an overall way, taking cellhouse layout as breakthrough to solve the problem according to plant existing land situation. Design on flood control should take important area into consideration and less important areas as well, specific analyze for specific case.
出处
《中国有色冶金》
北大核心
2008年第5期14-16,共3页
China Nonferrous Metallurgy
关键词
电解铝项目
电解厂房布置
铁路线布置
防洪排涝
eectrolytie aluminum project
cell house layout
railway line layout
flood control and drainage