摘要 1986年北京工人体育场经第一次改造后,经过长期使用以及在温度应力的作用下,部分斜梁在梁、柱节点附近存在裂缝,因此采用了体外预应力加固技术对其再次改造,以增加斜梁的抗裂能力和强度。对北京工人体育场看台斜梁采用体外预应力加固的结构体系,确定施加预应力大小的计算原则,转向块的设计以及施工过程和施工工艺进行介绍,表明了体外预应力加固方法的优越性。 Beijing Workers' Stadium was reinforced for the first time in 1986, after long application and effect of temperature stress, there were some cracks on partial inclined beams near the joints of beam and column. For the second reform, external prestressing is used for strengthening the beams. It is introduced the structural system of prestressed concrete members using external prestressing in the inclined beam of the Beijing Workers' Stadium, the principle of determining the prestressing force and the design of the deflector block;as well as the construction process and construction technology. Which shows the superiority of external prestressing strengthening.
出处 《工业建筑》 CSCD 北大核心 2008年第12期30-32,21,共4页 Industrial Construction
关键词 北京工人体育场 体外预应力 加固 钢绞线 转向块 Beijing Workers' Stadium external prestressing reinforcement steel wires deflector block
  • 相关文献

参考文献5

二级参考文献8

  • 1蒋元驹 韩素芳 等.混凝土工程病害与修补加固[M].北京:海洋出版社,1996.1-56.
  • 2傅温 张玉明 等.高效预应力混凝土工程技术.现代建筑技术实用丛书[M].北京:中国民航出版社,1996..
  • 3Harajli M, et al. Externally prestressed members: Evaluation of second-order effects. Journal of Structural Engineering, ASCE, 1999,125(10): 1151
  • 4Ariyawardena N D, et al. Prestressing with unbonded internal or external tendons: Analysis and computer model. Journal of Structural Engineering, ASCE, 2002, 128(12): 1493
  • 5Ariyawardena N D, et al. Design of precast prestressed concrete members using external prestressing. PCI Journal, 2002, 47 (2):84
  • 6混凝土结构设计规范进行全面修订 新修订的规范将于2000年颁布实施[J]混凝土,2000(01).
  • 7GB 50010-2002.混凝土结构设计规范[S],2002.
  • 8吴晓涵,吕西林.外张预应力钢筋混凝土结构非线性有限元分析[J].建筑结构学报,2001,22(5):1-5. 被引量:15