摘要
为缓解工作面采掘接替紧张局面,结合现场实际及综掘机施工的实践经验,对影响综掘工作面单进水平提高的原因进行系统分析及采取相应的对策,以提高综掘单进水平。
In order to relieve the lensions in mining and drilling shift, based on sile eondilions and praelical experiences of mining and drifting workers, systematic analysis on what will influence the improvement of single heading level at fully-mechanized coal minning have been conducted, and solutions been adopted, vith single heading level being improved.
出处
《煤矿现代化》
2008年第6期21-22,共2页
Coal Mine Modernization
关键词
综掘单进
影响因素
对策
single heading level al fidly-mechanized coal minning factors solutions