期刊文献+

面向设计者的协同产品开发过程仿真模型 被引量:4

Designer-oriented Integrated Simulation Model for Collaborative Product Development Process
下载PDF
导出
摘要 为了在协同产品开发过程仿真中体现设计者的主动性、自治性和协同性,提出一种以设计者智能主体为核心的集成过程仿真模型。对集成模型的设计者智能主体模型、任务、产品信息、资源和组织分模型进行了定义和描述,并对设计主体的行为协议进行了系统研究。基于主体模型开发了一个产品开发过程仿真平台,实现面向设计者的可视化建模与仿真功能,并通过仿真试验和应用实践验证了所提出的集成仿真模型的有效性,在某摩托车发动机的协同设计项目中进行了实际应用。面向设计者的仿真为协同产品开发过程中人与组织因素的分析提供了一种量化和动态的研究方法。 In order to reflect the initiative, autonomous and collaborative characteristics of the designer in collaborative product development process simulation, an integrated simulation model is formulated centered on the designer's intelligent agent model. Sub-models of designer, task, product information, resource and organization are defined and described. The designer's behavior protocols of the intelligent agent model are studies systematically. Thereafter, a product development process simulation platform is developed based on the agent model, which realizes visual designer-oriented modeling and simulation functions. A series of simulation experiments are carried out to validate the integrated simulation model. Finally, the model is applied to a motorcycle collaborative design project to optimize the organization factors. Designer-oriented simulation provides a quantitative and dynamic method to analyze human and organization factors in collaborative product development process.
出处 《机械工程学报》 EI CAS CSCD 北大核心 2008年第12期150-156,共7页 Journal of Mechanical Engineering
基金 国家自然科学基金(70501036) 重庆市科技攻关(2007AC2039)资助项目
关键词 协同产品开发 过程仿真模型 智能主体 Collaborative product development Process simulation model Intelligent agent
  • 相关文献

参考文献12

  • 1YAN H, WANG W, JIAO X. Modeling, scheduling and simulation of product development process by extended stochastic high-level evaluation petri nets[J]. Robotics and Computer Integrated Manufacturing, 2003, 19 (4): 329-342.
  • 2祖旭,黄洪钟,周峰,古莹奎.产品开发过程资源管理及其仿真[J].系统仿真学报,2005,17(6):1322-1325. 被引量:16
  • 3BROWNING T R, EPPINGER S D. Modeling impacts of process architecture on cost and schedule risk in product development[J]. IEEE Transactions on Engineering Management, 2002, 49(4): 428-442.
  • 4姚咏,范文慧,熊光楞.复杂产品开发过程仿真及其优化方法研究[J].系统仿真学报,2006,18(3):726-730. 被引量:20
  • 5傅谦,张申生,戴开宇.支持过程改进的工作流仿真研究[J].系统仿真学报,2002,14(10):1321-1324. 被引量:14
  • 6HORR/T, JIN Y, LEVVIT R E. Modeling and analyzing cultural influences on project team performance[J]. Computional & Mathematical Organization Theory, 2004, 10. 305-321.
  • 7LEVITT R E. Computational modeling of organizations, comes of age[J]. Computational and Mathematical Organization Theory, 2004, 10: 127-145.
  • 8LICHT T, SCHMIDT L, SCHLICK C, et al. Personcentered simulation and product development processes [J]. International Journal of Simulation and Process Modelling, 2007, 3(3): 1-32.
  • 9史忠植.智能Agent及其应用[M].北京:科学出版社,2000.
  • 10XIE B, SALVENDY G. Review and reappraisal of modelling and predicting mental workload in single- and multi-task environments[J]. Work & Stress, 2000, 14 (1): 74-99.

二级参考文献30

  • 1姚咏,熊光楞,范文慧.产品开发过程智能化分析与改进[J].计算机集成制造系统,2004,10(8):886-891. 被引量:3
  • 2Schlkopf B,Smola A J,Williamson R C,et al.New Support Vector Algorithms.Neural Computation,2000,12(5):1207-1245.
  • 3Sun Z H,Sun Y X.Fuzzy Support Vector Machine for Regression Estimation.IEEE International Conference on Systems,Man and Cybernetics,2003,4:3336-3341.
  • 4Lin C F,Wang S D.Fuzzy Support Vector Machines.IEEE Transactions on Neural Networks,2002,13(2):464-471.
  • 5Hong D H,Hwang C.Support Vector Fuzzy Regression Machines.Fuzzy Sets and Systems,2003,138(2):271-281.
  • 6Diamond P,Kloeden P.Metric Spaces of Fuzzy Sets.Singapore:World Scientific Press,1994.
  • 7Bashir H A,Thomson V.Models for Estimating Design Effort and Time.Design Studies,2001,22(2):141-155.
  • 8Griffin A.Modeling and Measuring Product Development Cycle Time Across Industries.Journal of Engineering and Technology Management,1997,14(1):1-24.
  • 9Kurt Jensen. An Introduction to the Theoretical Aspects of Coloured Petal Nets [J]. Lecture Notes in Computer Science, Springer-Verlag,1994, 803: 230-272.
  • 10CPN group at the Department of Computer Science, University of Aarhus, Denmark. [EB/OL]. http://www.daimi.au.dk/CPnets/, 2004.

共引文献63

同被引文献35

  • 1郭建飞,乔立红.产品开发过程的图示评审技术建模方法[J].计算机集成制造系统,2004,10(7):758-763. 被引量:14
  • 2祖旭,黄洪钟,周峰,古莹奎.产品开发过程资源管理及其仿真[J].系统仿真学报,2005,17(6):1322-1325. 被引量:16
  • 3徐志勇,张开富,李正兰,姜寿山.一种面向航空产品的分级网络计划方法[J].计算机集成制造系统,2006,12(5):727-730. 被引量:6
  • 4林慧苹,范玉顺,黄琛.产品设计中基于元模型的知识管理[J].计算机集成制造系统,2007,13(4):663-667. 被引量:11
  • 5Leong K K, Yu K M, Lee W B. Product data allocation for distributed product data management system [J]. Computer in Industry, 2003, 47: 289-298.
  • 6Chang Xiaomeng, Janis Terpenny. Ontology-based data integration and decision support for product e-design [J]. Robotics and Computer-Integrated Manufacturing, 2009, (4): 1-8.
  • 7Reza Ahmadi, Thomas A Roemer, Robert H Wang. Structuring product development processes [J]. European Journal of Operational Research, 2001, 130:539-558.
  • 8Hannu Peltonen, Olli Pitkanen, Reijo Sulonen. Process-based view of product data management [J]. Computers in Industry, 1996, 31: 195-203.
  • 9ZHANG Xiaodong, LUO Le, YANG Yu, et al. A simulation approach for evaluation and improvement of organisational planning in collaborative product development projects[J].International Journal of Production Research,2009,47(13) :3471 -3501.
  • 10EVARISTO R,FENEMA P.A typology of project management:Emergence and evolution of new forms[J].International Journal of Project Management,1999,17:275-281.

引证文献4

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部