摘要 根据具体工程,将深基坑、土钉支护结构、紧邻建筑物放在一个系统研究。在对紧邻建筑物变形进行数值计算的同时也在施工过程中对紧邻建筑物变形从基底到顶部进行全面监测,然后对比分析二者结果,证明了支护方案的可行性,为深基坑工程的安全施工提供了一定的指导作用。 According to an instance of deep foundation excavation projects, deep foundation excavations, supporting structure and adjacent building are put into one system. The deformations of adjacent building are simulated and analyzed numerically. During the construction, the deformations of adjacent building are monitored particularly from bottom to top. Contrasting the simulation results with the results monitored, It is proved that the designed scheme of supporting for foundation pit is feasible, and gives a direction for the design and construction of deep foundation excavation engineering.
作者 王现成 梁涛
出处 《建筑技术开发》 2008年第12期10-12,28,共4页 Building Technology Development
关键词 土钉支护 紧邻建筑物 变形 数值模拟 施工监测 The supporting structure with soil-nailed Adjacent building Deformation Numerical simulation Construction monitoring
  • 相关文献

参考文献3

  • 1建筑基坑支护技术规程(JGJ120—1999).北京:中国建筑工业出版社,2005
  • 2锚杆喷射混凝土支护技术规范(GB50086—2001).北京:中国建筑工业出版社,2005
  • 3.建筑地基基础设计规范(GB50007—2002)[M].北京:中国建筑工业出版社,2002..

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部