运用遗传算法实现项目调度中的现金流优化 被引量:1

Applying genetic algorithm to optimize cash flows in project scheduling problem
下载PDF
导出
摘要 多模式的资源受限项目调度问题(MRCPSP)是生产实践中的一类常见的重要问题,它具有NP-完全性质,难以在多项式时间内准确求解。现金流是项目财务管理及风险评估的重要指标,实现现金流优化对项目管理具有重要的意义。考虑了现金流优化与项目调度相结合的带折现流的多模式资源受限项目调度模型(MRCPSPDCF),首先对该模型建模,然后给出运用遗传算法求解的具体方案,考虑了里程碑事件和相等时间间隔两种支付方式,在仿真实验中比较了这两种支付方式的实验结果,并证明了遗传算法的有效性。 The multi-mode resource constrained project scheduling problem (MRCPSP) is common and important in manufacturing applications. It is a well-known NP-complete problem which cannot be accurately figured out by a polynomial-time method. Cash flow is the crucial criterion for project financial management and risk evaluation. So it is of great significance to optimize the cash flows of a project. The cash flow criterion is incorporated into the project scheduling problem to consider the model of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF). The model is formulated, and then a genetic algorithm (GA) approach is proposed. Two different payment models are taken into account in the model, which are the payments at event occurrences (PEO) and the equal time intervals (ETI) model. Numerical experiments are implemented to compare the performance of these two payment models as well as to demonstrate the effectiveness of the GA approach.
出处 《计算机工程与设计》 CSCD 北大核心 2008年第23期6049-6056,共8页 Computer Engineering and Design
基金 国家自然科学基金项目(60573066) 广东省自然科学基金项目(5003346) 教育部留学回国人员科研启动基金项目(教外司留[2006]331号)。
关键词 遗传算法 现金流 净现值 资源受限项目调度 多模式 genetic algorithm cash flows net present value resource constrained project scheduling multi-mode
  • 相关文献

参考文献13

  • 1Tavares L V.A review of the contribution of operation research to project management[J]. European Journal of Operational Research, 2002,136:1 - 18.
  • 2何正文,徐渝,朱少英.Max-npv项目进度问题研究评述[J].管理工程学报,2005,19(4):60-63. 被引量:24
  • 3Doersch R H,Patterson J H.Scheduling a project to maximize its present value, zero-one programming approach[J].Management Science, 1977,23:882-889.
  • 4Russell A.H.Cash flows in networks[J].Management Science, 1970,16:357-373.
  • 5Icmeli O, Erenguc S S.The resource constrained time cost tradeoff project scheduling problem with discounted cash flows[J]. Journal of Operations Management, 1996,14:255-275.
  • 6Ulusoy G, Cebelli S. An equitable approach to the payment scheduling problem in project management[J]. European Journal of Operational Research, 2000,127:262-278.
  • 7Mohring R H.Minimizing costs of resource requirements in project networks subject to a fix completion time[J].Operational Research, 1984,32:89-120.
  • 8Yang K K, Talbot F B, Patterson J H. Scheduling a project to maximize its net present value: an integer programming approach [J]. European Journal of Operational Research,1992,64: 188-198.
  • 9Icmeli O,Erenguc S S.A branch and bound procedure for the resource constrained project scheduling problem with discounted cash flows[J]. Working Paper, Cleveland State University, 1995.
  • 10Icmeli O,Erenguc S S.A tabu search procedure for resource constrained project schedule to improve project scheduling problems with discounted cash flows[J].Computers and Operations Research, 1994,21 (8):841-853.

二级参考文献40

  • 1[日]玄光男 程润伟 等.遗传算法与工程设计[M].北京:科学出版社,2000..
  • 2Russell A H. Cash flows in networks[J]. Management Science, 1970,16(5) :357 ~ 373.
  • 3Grinold R C. The payment scheduling problem [J]. Naval Research Logistics Quarterly, 1972,19(1): 123 ~ 136.
  • 4Elmaghraby S E, Herroelen W. The scheduling of activities to maximize the net present value of projects [J]. European Journal of Operational Research, 1990,49: 35 ~ 49.
  • 5Herroelen W, Gallens E. Computational experience with an optimal procedure for the scheduling of activities to maximize the net present value of projects[J]. European Journal of Operational Research, 1993,65: 274 ~ 277.
  • 6Demuelemeester E, Herroelen W, Van D P. An optimal recursive search procedure for the deterministic unconstrained max-npv project scheduling problem. Technical Report, Katholieke University, 1996.
  • 7Sepil C, Kazaz B. Project scheduling with discounted cash flows and progress payments. Working Paper, Middle East Technical University,1994.
  • 8Smith-Daniels D E. Summary measures for predicting the net present value of a project. Working Paper, College of St. Thomas, 1986.
  • 9Buss A H, Rosenblatt M J. Activity delay in stochastic project networks. Working Paper, Washington University, 1993.
  • 10Yang K K, Talbot F B, Patterson J H. Scheduling a project to maximize its net present value: an integer programming approach [J]. European Journal of Operational Research, 1992,64: 188~198.

共引文献259

同被引文献5

引证文献1

二级引证文献2