期刊文献+

尼日利亚D-7井复杂问题分析及对策

Technical Analysis and Solutions of Complex Problems in D-7 well Drilling Operations in Nigeria
下载PDF
导出
摘要 D-7井是中国石化在尼日利亚XX油田J构造的一口双靶心定向井,由于施工中出现落物、卡钻及井壁坍塌等复杂事故导致多次填井侧钻,严重影响本区块的钻井时效。文章通过对钻井数据的分析及开展的相关室内评价实验,从钻井工艺、钻井液工艺等方面分析了造成该井工程技术难题的原因,为以后的钻井施工提供技术帮助。 D-7 well drilled in J structure in Nigeria XX oilfield by Sinopee is a duplex targets directional well. In the drilling process, junk, drilling pipe sticking and well wall sloughing occurred which caused sidetrack drilling time and again and influenced drilling time-efficiency seriously. This article analysis the drilling data and the lab test data, and gives the reasons of drilling complex problems about drilling technology and drilling fluid technology, and provides the drilling technical assistant of this area.
出处 《内蒙古石油化工》 CAS 2008年第22期133-135,共3页 Inner Mongolia Petrochemical Industry
关键词 键槽卡钻 井壁坍塌 复杂问题 Key seating sticking Well wall sloughing Complex problem
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部