大型水电站围堰及岩坎爆破拆除中的安全防护问题研究 被引量:14

RESEARCH ON SAFETY PROTECTION PROBLEMS IN BLASTING DEMOLITION OF COFFERDAM AND ROCK RIDGE OF LARGE HYDROPOWER STATION
下载PDF
导出
摘要 大型水电站围堰拆除爆破要考虑爆破振动波、水击波、涌浪及动水压力、个别飞石等效应对邻近建筑物的影响,并针对不同类型的建筑物物理特性,制定恰当的爆破安全控制标准,并采取相应的措施,使爆破有害效应控制在允许范围以内。本文以小湾水电站导流洞围堰爆破拆除为例,总结分析了爆破拆除过程中的问题及相应的解决方法。 In blasting demolition of cofferdam and rock ridge of large hydropower station, the effects of blasting vibration, water blast wave, surging wave and unexpected slungshot etc to surrounding construction must be considered. And it is also necessary to establish appropriate blast safety control criterion for the physical characteristic of different style building and to adopt corresponding measures for making the blasting destructive impact controlled under safety scope. The present paper summarizes and analyzes the key problems and their solving solutions in blasting demolition of cofferdam by taking the blasting operation conducted in the Xiaowan Hydropower Station as an instance.
出处 《工程爆破》 2008年第4期76-81,共6页 Engineering Blasting
关键词 围堰 爆破拆除 安全防护 Cofferdam Balsting Demolition Safety Protection
  • 相关文献

参考文献2

二级参考文献6

  • 1熊长汉.葛洲坝大江上游围堰拆除爆破水击波监测报告[M].长江科学院,1985..
  • 2刘美山.三峡永久船闸下游泄水箱涵出口爆破水击波测试报告[M].长江科学院,2000..
  • 3熊长汉.青岛2458工程船坞岩坎拆除爆破水击波测试报告[M].长江科学院,1992..
  • 4赵根.青岛灵山船厂船坞岩坎拆除爆破水击波测试报告[M].长江科学院,1994..
  • 5杨光旭.水下工程爆破[M].长江水利委员会,1990..
  • 6赵根.云南大朝山水电站岩埂爆破[M].长江科学院,2001..

共引文献17

同被引文献86

引证文献14

二级引证文献58

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部