摘要
介绍了目前水利水电工程招标工作中存在的"围标"、"挂靠"、"串标"现象,分析了现行招投标制度中容易产生这些问题的原因,总结了广西水利电业集团实行设计动态标的、分散招投标权利、严格退出机制、追究违约责任等一整套办法的经验,实现了对招投标的有效监管。
Based on a brief introduction of the phenomena existing in current bidding invitation for water conservancy and hydropower project, such as besieging biding, bidder nominally attached to a major company, colluding bid, the author analyzed the causes for these problems and summarized the experience of Guangxi Water Resources & Electric Power Group in effective supervision and administration of bidding work, including dynamic bidding objectives, decentralization of bidding rights, strict withdrawing rules, taking action against those violating agreement etc.
出处
《广西水利水电》
2008年第5期43-45,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
水利水电工程
工程招投标制度
设计
Water conservancy and hydropower
bidding invitation and bidding for project
regulation design