摘要
贵溪冶炼厂电解车间二系列通过改变出槽作业方式,不仅使电解液的体积控制更加稳定,而且作业率得到了显著提高,本文就原来的作业方式存在的问题、措施及改进后的效果进行阐述。
The volume of the electrolyte can be stabilized and the operation efficiency be increased by modifying the loading and unloading methods of the tankhouse for the second refining system in Guixi Smelter. This paper describes the problems existing before the modification and their countermeasures as well as results after modification.
出处
《铜业工程》
CAS
2008年第3期36-37,共2页
Copper Engineering
关键词
出槽作业方式
电解液体积的稳定控制
作业率
operation of loading and unloading cells
stabilization of the electrolyte volume
operation efficiency