摘要
随着现代城市高层建筑的日益增多,对地下工程的施工工期及防水工程的质量提出了更高的要求。因此,有必要改进地下防水工程的构造,缩短地下防水工程的施工工期,并进一步提高防水工程的施工质量。
The higher demands of construction period of underground engineering and quality of waterproof engineering are needed with the increase of high - rise architecture in modem city. It is necessary to improve the conformation of underg-round waterproof engineering, reducing its construction period and improving its construction quality.
出处
《林业科技情报》
2008年第4期37-38,共2页
Forestry Science and Technology Information
关键词
加强带
施工程序
防水层
隔离层
止水带
钢板网隔断
strengthening band
construction program
waterproof layer
separator
water stop tie
steel obstruct